Loading...
Loading...
ADU Construction in Scarborough, Ontario: design, permit and build on a single contract. A typical 700 sq ft unit estimates at $275,000-$368,500 (about $393/sq ft), with $8,000-$14,000 under the City of Toronto fee schedule in municipal approvals and a April-November construction season.

The construction phase itself - excavation, foundation, framing, services and finishes - for homeowners who already hold approved ADU drawings and a permit.
Service area
Scarborough, Ontario
City of Toronto
Typical build estimate
$275,000-$368,500
about $393/sq ft in Scarborough
Municipal approvals
$8,000-$14,000 under the City of Toronto fee schedule
quoted separately from the build
Build season
April-November
118 cm snow · -3.9°C winter avg
Frost depth
1.2 m
footing depth, OBC Part 9
Local market
629,941
residents · walkability 52/100
Scarborough's slope toward the Bluffs is a design asset: on Guildwood and Cliffside lots the natural grade drop lets us build a legal walk-out basement suite at the front and still place a garden suite at the rear, producing two rentable units from one permit cycle. City of Toronto garden suite rules apply; Scarborough's wide lots also make basement secondary suites with separate walk-out entrances viable alongside a detached unit. Wide suburban lots with grade changes toward the Bluffs, frequently allowing a walk-out basement suite as well as a rear garden suite.
Lake-moderated winters in Scarborough - 118 cm of snow, -3.9°C average - give one of the longest build seasons in the region (April-November), which shortens the permit-to-occupancy timeline on adu construction.
Construction in Scarborough is sequenced around one hard date - the day the ground closes - because footings to 1.2 m cannot be poured into frozen soil without heat and hoarding costs that change the budget. Excavation, foundation and envelope land inside the April-November window; mechanical, drywall and finishing then run through winter, with inspections booked against City of Toronto's calendar rather than ours. Roof structure on every Scarborough build is sized for 118 cm of annual snow load against -3.9°C design winters - the two numbers that separate a GTA build spec from a generic one.
Everything you need to know about our services.
A typical 700 sq ft build in Scarborough estimates at $275,000-$368,500 - about $393/sq ft, set by $8,000-$14,000 under the City of Toronto fee schedule in approvals, a 1.2 m frost-depth footing requirement and 118 cm of annual snow load. Final pricing follows the site visit.
Related service: Accessory Dwelling Units
City of Toronto garden suite rules apply; Scarborough's wide lots also make basement secondary suites with separate walk-out entrances viable alongside a detached unit. Approval costs in Scarborough run $8,000-$14,000 under the City of Toronto fee schedule, quoted separately from construction so the permit stage holds no surprises.
Related service: Secondary Suites
Wide suburban lots with grade changes toward the Bluffs, frequently allowing a walk-out basement suite as well as a rear garden suite. At 52/100 walkability, Scarborough suites usually keep one parking space: enough to clear the zoning review without surrendering the whole yard. We work regularly in Agincourt, Guildwood, West Hill.
Related service: Accessory Dwelling Units
The build is gated by the April-November season rather than by labour: the foundation has to be in before the ground closes, after which envelope and interior work continue through winter. Starting the permit early enough to pour in season is the single largest schedule lever on a Scarborough project.
Related service: Accessory Dwelling Units
Get a free, no-obligation quote from GTA ADU Builders - zoning review, permit drawings and construction for ADUs across the GTA.