Prefab ADU in King, Ontario: design, permit and build on a single contract. A typical 700 sq ft unit estimates at $269,500-$361,000 (about $385/sq ft), with $9,000-$16,500 including York Region and septic charges in municipal approvals and a May-October construction season.

Pre-designed ADU models with known pricing and shortened build times - choose a proven layout instead of starting a custom design from scratch.
Service area
King, Ontario
York Region
Typical build estimate
$269,500-$361,000
about $385/sq ft in King
Municipal approvals
$9,000-$16,500 including York Region and septic charges
quoted separately from the build
Build season
May-October
150 cm snow · -5.3°C winter avg
Frost depth
1.2 m
footing depth, OBC Part 9
Local market
27,333
residents · walkability 21/100
King Township is almost entirely Oak Ridges Moraine and Greenbelt, with core-area designations that prohibit new building envelopes outright on some parcels. We run a moraine designation check against the property roll number before quoting a King City or Nobleton laneway-suite or garden-suite project, because on a core-area lot the honest answer is sometimes no. King Township permits additional dwelling units, with Oak Ridges Moraine and Greenbelt policies plus private servicing governing the majority of properties.
Estate and agricultural parcels, many over an acre, on private well and septic with moraine core-area restrictions. North-GTA snowfall of 150 cm and -5.3°C winters give King a May-October working season - foundations for prefab adu go in before the ground closes, with interior finishing carried through the cold months.
A prefabricated unit shifts the build off your King lot and into a factory, which trades weather risk for access risk: the module still has to arrive on a truck and be craned over the house or in from the side yard. The site scope narrows to the foundation and the hookups - a 1.2 m frost footing or a screw-pile array, service trenching, then a one-day set - so the May-October window constrains far less of the schedule. Modules are CSA A277 certified in plant, so the York Region inspector reviews the foundation, the connections and the set rather than re-inspecting the framing and insulation.
Everything you need to know about our services.
A typical 700 sq ft build in King estimates at $269,500-$361,000 - about $385/sq ft, set by $9,000-$16,500 including York Region and septic charges in approvals, a 1.2 m frost-depth footing requirement and 150 cm of annual snow load. Final pricing follows the site visit.
Related service: Accessory Dwelling Units
King Township permits additional dwelling units, with Oak Ridges Moraine and Greenbelt policies plus private servicing governing the majority of properties. Approval costs in King run $9,000-$16,500 including York Region and septic charges, quoted separately from construction so the permit stage holds no surprises.
Related service: Accessory Dwelling Units
Estate and agricultural parcels, many over an acre, on private well and septic with moraine core-area restrictions. King is car-oriented at 21/100 walkability, so parking retention and driveway access constrain the footprint more than the zoning envelope does. We work regularly in King City, Nobleton, Schomberg.
Related service: Accessory Dwelling Units
On site, yes - the module is built in plant while the foundation is poured in King, and the set itself takes a day. The saving is real but it is against the May-October construction window, not against the permit review, which runs the same length and the same $9,000-$16,500 including York Region and septic charges either way.