Loading...
Loading...
Basement Suites in Etobicoke, Ontario: design, permit and build on a single contract. A typical 700 sq ft unit estimates at $93,500-$151,500 (about $393/sq ft), with $8,000-$14,000 under the City of Toronto fee schedule in municipal approvals and a April-November construction season.

Legal basement suite conversions - underpinning, separate entrance, egress windows and fire separation to bring an existing basement up to a rentable second unit.
Service area
Etobicoke, Ontario
City of Toronto
Typical build estimate
$93,500-$151,500
about $393/sq ft in Etobicoke
Municipal approvals
$8,000-$14,000 under the City of Toronto fee schedule
quoted separately from the build
Build season
April-November
115 cm snow · -3.7°C winter avg
Frost depth
1.2 m
footing depth, OBC Part 9
Local market
365,143
residents · walkability 54/100
Etobicoke is really two build zones. South of the Gardiner in Mimico, New Toronto and Long Branch the original streetcar-suburb grid still has rear lanes, so laneway suites are permitted; north in The Kingsway and Markland Wood the lots are large and treed, which turns almost every project into a garden suite with an arborist report attached. Covered by the City of Toronto laneway and garden suite by-laws; the older Mimico and New Toronto grid does carry laneways, the Kingsway and Markland Wood do not.
Split personality - laneway-served lakeshore grid in Mimico and New Toronto, versus large treed lots in The Kingsway where garden suites dominate. Lake-moderated winters in Etobicoke - 115 cm of snow, -3.7°C average - give one of the longest build seasons in the region (April-November), which shortens the permit-to-occupancy timeline on basement suites.
A basement suite lives or dies on two measurements taken inside the existing Etobicoke house: finished ceiling height under the joists, and whether a code-compliant egress window can be cut without undermining the foundation wall. Where the head height is short, we underpin or bench the footing - a wet-trades sequence that runs year-round indoors, which is why basement work is the form we schedule outside the April-November window. Fire separation between the two dwellings, an independent exit, and interconnected alarms are the three items that most often turn an existing finished basement into a non-compliant one.
Everything you need to know about our services.
A typical 700 sq ft build in Etobicoke estimates at $93,500-$151,500 - about $393/sq ft, set by $8,000-$14,000 under the City of Toronto fee schedule in approvals, a 1.2 m frost-depth footing requirement and 115 cm of annual snow load. Final pricing follows the site visit.
Related service: Our ADU services
Covered by the City of Toronto laneway and garden suite by-laws; the older Mimico and New Toronto grid does carry laneways, the Kingsway and Markland Wood do not. Approval costs in Etobicoke run $8,000-$14,000 under the City of Toronto fee schedule, quoted separately from construction so the permit stage holds no surprises.
Related service: Garden Suites
Split personality - laneway-served lakeshore grid in Mimico and New Toronto, versus large treed lots in The Kingsway where garden suites dominate. At 54/100 walkability, Etobicoke suites usually keep one parking space: enough to clear the zoning review without surrendering the whole yard. We work regularly in Mimico, The Kingsway, Long Branch.
Related service: Garden Suites
Often, yes, but a finished basement is not a legal second unit until it has its own exit, the required fire separation between dwellings, interconnected alarms and a ceiling height that meets the Ontario Building Code. We survey what exists in Etobicoke first and price only the delta, so approvals stay near $8,000-$14,000 under the City of Toronto fee schedule rather than a full rebuild.
Related service: Secondary Suites
Get a free, no-obligation quote from GTA ADU Builders - zoning review, permit drawings and construction for ADUs across the GTA.