Loading...
Loading...
Basement Suites in East York, Ontario: design, permit and build on a single contract. A typical 700 sq ft unit estimates at $95,500-$155,000 (about $402/sq ft), with $8,000-$14,000 under the City of Toronto fee schedule in municipal approvals and a April-November construction season.

Legal basement suite conversions - underpinning, separate entrance, egress windows and fire separation to bring an existing basement up to a rentable second unit.
Service area
East York, Ontario
City of Toronto
Typical build estimate
$95,500-$155,000
about $402/sq ft in East York
Municipal approvals
$8,000-$14,000 under the City of Toronto fee schedule
quoted separately from the build
Build season
April-November
120 cm snow · -3.8°C winter avg
Frost depth
1.2 m
footing depth, OBC Part 9
Local market
118,071
residents · walkability 66/100
East York's wartime housing stock sits on some of the smallest lots inside the amalgamated city, so the binding constraint here is almost never lot coverage - it is the angular plane measured off the rear property line. We design East York garden suites around that plane first and the floor plan second. City of Toronto by-laws apply; East York's tight lots make the 4 m rear-yard setback and 6 m height cap the binding constraints on most designs.
Compact wartime-housing lots, often 30 ft × 100 ft, where the garden suite footprint is set by angular-plane rules rather than by lot coverage. East York sees 120 cm of snow and -3.8°C winter averages. Ontario's 1.2 m frost-depth requirement governs every footing we pour for basement suites, and the April-November season sets the excavation window.
A basement suite lives or dies on two measurements taken inside the existing East York house: finished ceiling height under the joists, and whether a code-compliant egress window can be cut without undermining the foundation wall. Where the head height is short, we underpin or bench the footing - a wet-trades sequence that runs year-round indoors, which is why basement work is the form we schedule outside the April-November window. Fire separation between the two dwellings, an independent exit, and interconnected alarms are the three items that most often turn an existing finished basement into a non-compliant one.
Everything you need to know about our services.
A typical 700 sq ft build in East York estimates at $95,500-$155,000 - about $402/sq ft, set by $8,000-$14,000 under the City of Toronto fee schedule in approvals, a 1.2 m frost-depth footing requirement and 120 cm of annual snow load. Final pricing follows the site visit.
Related service: Our ADU services
City of Toronto by-laws apply; East York's tight lots make the 4 m rear-yard setback and 6 m height cap the binding constraints on most designs. Approval costs in East York run $8,000-$14,000 under the City of Toronto fee schedule, quoted separately from construction so the permit stage holds no surprises.
Related service: Our ADU services
Compact wartime-housing lots, often 30 ft × 100 ft, where the garden suite footprint is set by angular-plane rules rather than by lot coverage. East York scores 66/100 on walkability, so many tenants here do not need the extra parking space - that frees rear-yard area for the unit itself. We work regularly in Leaside, Pape Village, Woodbine Heights.
Related service: Garden Suites
Often, yes, but a finished basement is not a legal second unit until it has its own exit, the required fire separation between dwellings, interconnected alarms and a ceiling height that meets the Ontario Building Code. We survey what exists in East York first and price only the delta, so approvals stay near $8,000-$14,000 under the City of Toronto fee schedule rather than a full rebuild.
Related service: Secondary Suites
Get a free, no-obligation quote from GTA ADU Builders - zoning review, permit drawings and construction for ADUs across the GTA.