Garden suites, laneway homes, basement and secondary suites built for in-law and multigenerational suites across the 30 municipalities of the Greater Toronto Area - zoning review, permit drawings and construction handled by one team.

Key Takeaways
- Key features: Garden suite for parents moving in from out of province, Basement in-law suite with private walk-out entrance, Adult child housed on-site while saving for a first home
Families housing parents or adult children on the same property without sharing a front door. We design in-law suites with their own kitchen, bathroom and entrance, close enough for daily support and separate enough for privacy.
Key takeaways
- Families housing parents or adult children on the same property without sharing a front door - near enough to check in without phoning, far enough that two households do not share a kitchen sink at seven in the morning.
- That brief has a legal shape: a multigenerational suite only works long term as a legal additional residential unit, because the family situation changes - a parent moves into care, a child buys their own home, the property sells.
- A permitted unit becomes rentable income or a documented feature at sale; an unpermitted one becomes a disclosure problem and an insurance exclusion.
- Design here is driven by care, not yield: single-storey layouts, step-free entry, blocking for future grab bars, and sound separation that matters more than in a rental because privacy is the entire point.
Families housing parents or adult children on the same property without sharing a front door. We design in-law suites with their own kitchen, bathroom and entrance, close enough for daily support and separate enough for privacy. The brief we hear most often is a specific distance: near enough to check in without phoning, far enough that two households do not share a kitchen sink at seven in the morning.
That brief has a legal shape. A multigenerational suite only works long term if it is a legal additional residential unit rather than an unpermitted conversion - because the family situation changes. A parent moves into care, an adult child buys their own home, the property sells. A permitted unit becomes rentable income or a documented feature at sale; an unpermitted one becomes a disclosure problem and an insurance exclusion. We build the permitted version from the start, whether that is an internal suite or a detached accessory dwelling unit in the rear yard.
Bill 23, the More Homes Built Faster Act (2022), is what makes this straightforward now. Ontario municipalities must permit up to three residential units as-of-right on most serviced lots holding a detached, semi-detached or townhouse dwelling, so the usual family arrangement - main house plus one internal suite plus one detached garden suite - no longer needs a rezoning application that used to run six to twelve months and could simply be refused. The governing regulation is O. Reg. 299/19 on additional residential units as amended in November 2024, with construction to the Ontario Building Code and energy compliance filed under the SB-10 and SB-12 supplementary standards.
Design decisions in this segment are driven by care, not by yield. Single-storey layouts, a step-free entry, wider door openings, blocking in the bathroom walls for future grab bars, and a bedroom sized for a hospital bed if it ever comes to that - all of it costs little during framing and is expensive to retrofit. Sound separation between the two dwellings matters more here than in a rental, because the occupants see each other daily and privacy is the entire point of building rather than converting a spare bedroom.
Budget and schedule follow the same GTA bands as any other unit: roughly $200,000 to $350,000 for a detached 500 to 600 sq ft suite, or $300 to $600 per square foot depending on site access and finish, with four to eight weeks of permit review and four to eight months of construction. Ravine, valley-land, Oak Ridges Moraine and Niagara Escarpment lots need conservation authority sign-off under the amended Conservation Authorities Act in force since 1 April 2024, and that approval is the single most common reason a family project slips a season.
Approval costs and lot conditions in the GTA municipalities where we build most often for this use.
| Municipality | Typical approval fees | Lot typology |
|---|---|---|
| Toronto | $8,000-$14,000 in permit, development and plan-review fees | Narrow downtown lots with rear public laneways - Toronto has over 300 km of them, more laneway frontage than any other Canadian city. |
| Brampton | $5,500-$10,000 including Brampton registration and Peel charges | Deep newer-subdivision lots, many with an existing unregistered basement apartment that must be brought to Ontario Building Code fire-separation standard. |
| Mississauga | $6,500-$11,000 in City of Mississauga and Region of Peel charges | Large 1970s-90s subdivision lots with attached garages; garage conversions and rear coach houses are both common outcomes. |
| York | $8,000-$14,000 under the City of Toronto fee schedule | Older narrow semi-detached lots on a laneway grid, with frequent shared-driveway conditions that must be resolved before permit. |
| Etobicoke | $8,000-$14,000 under the City of Toronto fee schedule | Split personality - laneway-served lakeshore grid in Mimico and New Toronto, versus large treed lots in The Kingsway where garden suites dominate. |
| Ajax | $7,000-$12,000 including Durham Region charges | Compact 1990s-2000s subdivision lots where the required 1.2 m side-yard construction access sets the maximum module width we can crane in. |
| King | $9,000-$16,500 including York Region and septic charges | Estate and agricultural parcels, many over an acre, on private well and septic with moraine core-area restrictions. |
| North York | $8,000-$14,000 under the City of Toronto fee schedule | Deep post-war bungalow lots, commonly 50 ft × 120 ft, with rear yards large enough for a detached garden suite plus the required 1.5 m separation. |
Fee bands are indicative, drawn from project experience - confirm current tariffs with the municipality before budgeting.
Everything you need to know about our services.
Families housing parents or adult children on the same property without sharing a front door. We design in-law suites with their own kitchen, bathroom and entrance, close enough for daily support and separate enough for privacy. The situations we see most often: garden suite for parents moving in from out of province; basement in-law suite with private walk-out entrance; adult child housed on-site while saving for a first home; two-generation household sharing a lot but not a kitchen.
Related service: Garden Suites
Our estimate band on a 700 sq ft reference unit runs $91,000-$147,500 in Brock to $95,500-$155,000 in East York, about $383-$402 per square foot. This scope involves no new envelope - the money goes into fire separation, egress windows, ceiling height and a second kitchen. Municipal approvals are quoted on top and separately, between $5,500-$10,000 including Brampton registration and Peel charges and $9,000-$16,000 including Peel Region and septic permit charges depending on the municipality.
Related service: Our ADU services
On most serviced GTA lots, yes. Bill 23 and O. Reg. 299/19 permit up to three residential units as-of-right on a lot already holding a detached, semi-detached or townhouse dwelling.
What actually decides it is the local by-law's rear-yard coverage, setback and height limits, plus conservation-authority screening (TRCA, Credit Valley, LSRCA) where the lot is in a regulated area. We check all of that before design starts, not after.
Related service: Our ADU services
It depends on the lot rather than on the preference. A rear yard with clear access supports a detached garden suite or laneway house; an existing garage on a sound slab makes a conversion the cheapest legal route; a full-height basement with a walk-out is the fastest path to a permitted interior suite. We give the answer at the feasibility review, with the by-law citation behind it.
Related service: Laneway Homes
Eight to fourteen months end to end - design, four to eight weeks of plan review, then construction - across all 30 GTA municipalities we serve. Excavation is scheduled inside the local building season; interior work continues through winter.
Related service: Our ADU services
Building for in-law and multigenerational suites? As adu builders across the GTA we scope the ADU that fits your lot - zoning check, permit drawings and construction.