Garden suites, laneway homes, basement and secondary suites built for aging in place across the 30 municipalities of the Greater Toronto Area - zoning review, permit drawings and construction handled by one team.

Key Takeaways
- Key features: Single-storey garden suite replacing a move to a retirement home, Parent downsizing into the backyard while the family takes the main house, Step-free ADU built for a homeowner anticipating mobility loss
Older homeowners who want to stay on their own property instead of moving to a retirement residence. Single-storey ADUs with step-free entry, wider doorways and a curbless shower let a parent downsize onto the same lot the family already owns.
Key takeaways
- Older homeowners who want to stay on their own property: a single-storey unit with step-free entry lets a parent downsize onto the lot the family already owns, keeping the address, the neighbourhood and the garden.
- The honest framing is financial - a $200,000-$350,000 one-time capital cost against an indefinite monthly fee at a retirement residence, with the family still owning the asset and the lot at the end.
- Designing for aging in place is a set of decisions made at framing, not at finishing: level entry, 900 mm openings, blocking for grab bars that may not be installed for a decade, a bedroom that takes a hospital bed.
- Eight to fourteen months end to end is the number a family should plan a parent's timeline around - and conservation authority sign-off, required since 1 April 2024, is the clock we start early.
Older homeowners who want to stay on their own property instead of moving to a retirement residence. A single-storey accessory dwelling unit with step-free entry, wider doorways and a curbless shower lets a parent downsize onto the same lot the family already owns, keeping the address, the neighbourhood and the garden while handing the maintenance of a full house to someone else.
The financial comparison is the honest way to frame this segment. A detached garden suite of 500 to 600 sq ft runs roughly $200,000 to $350,000 across the Greater Toronto and Hamilton Area, or $300 to $600 per square foot depending on site access and finish. That is a one-time capital cost against an indefinite monthly fee at a retirement residence, and at the end of it the family still owns the asset and the lot. Where the main house is then occupied by adult children or rented, the arrangement can carry itself.
Designing for aging in place is a set of decisions made at framing, not at finishing. Level entry with no threshold lip, 900 mm door openings, a bathroom laid out for a walker turning circle, blocking in the walls for grab bars that may not be installed for a decade, a curbless shower with a linear drain, rocker switches at 1,100 mm and outlets raised off the floor, and a bedroom that can take a hospital bed with clearance on both sides. Every one of these is inexpensive while the walls are open and disruptive to retrofit once the unit is occupied - which is exactly when a mobility change tends to arrive.
The regulatory route is the same as any additional residential unit. Bill 23 (2022) requires Ontario municipalities to permit up to three residential units as-of-right on most serviced lots, removing the rezoning application that used to take six to twelve months. O. Reg. 299/19, amended November 2024, governs additional residential units, and O. Reg. 462/24 harmonises municipal by-laws against province-wide garden-suite criteria. Construction is to the Ontario Building Code with SB-10 and SB-12 energy compliance. In Toronto there is no parking requirement for garden suites, which frees rear-yard area for a wider unit and a gentler approach path.
Two practical constraints shape schedule. Permit review runs four to eight weeks and construction four to eight months, so eight to fourteen months end to end is the honest number for a family planning around a parent's timeline. And on ravine, valley-land, Oak Ridges Moraine or Niagara Escarpment lots the amended Conservation Authorities Act has required TRCA or Credit Valley Conservation sign-off since 1 April 2024. We start both clocks early rather than discovering them at drawing stage.
Approval costs and lot conditions in the GTA municipalities where we build most often for this use.
| Municipality | Typical approval fees | Lot typology |
|---|---|---|
| Toronto | $8,000-$14,000 in permit, development and plan-review fees | Narrow downtown lots with rear public laneways - Toronto has over 300 km of them, more laneway frontage than any other Canadian city. |
| Brampton | $5,500-$10,000 including Brampton registration and Peel charges | Deep newer-subdivision lots, many with an existing unregistered basement apartment that must be brought to Ontario Building Code fire-separation standard. |
| Mississauga | $6,500-$11,000 in City of Mississauga and Region of Peel charges | Large 1970s-90s subdivision lots with attached garages; garage conversions and rear coach houses are both common outcomes. |
| York | $8,000-$14,000 under the City of Toronto fee schedule | Older narrow semi-detached lots on a laneway grid, with frequent shared-driveway conditions that must be resolved before permit. |
| Etobicoke | $8,000-$14,000 under the City of Toronto fee schedule | Split personality - laneway-served lakeshore grid in Mimico and New Toronto, versus large treed lots in The Kingsway where garden suites dominate. |
| Ajax | $7,000-$12,000 including Durham Region charges | Compact 1990s-2000s subdivision lots where the required 1.2 m side-yard construction access sets the maximum module width we can crane in. |
| King | $9,000-$16,500 including York Region and septic charges | Estate and agricultural parcels, many over an acre, on private well and septic with moraine core-area restrictions. |
| North York | $8,000-$14,000 under the City of Toronto fee schedule | Deep post-war bungalow lots, commonly 50 ft × 120 ft, with rear yards large enough for a detached garden suite plus the required 1.5 m separation. |
Fee bands are indicative, drawn from project experience - confirm current tariffs with the municipality before budgeting.
Everything you need to know about our services.
Older homeowners who want to stay on their own property instead of moving to a retirement residence. Single-storey ADUs with step-free entry, wider doorways and a curbless shower let a parent downsize onto the same lot the family already owns. The situations we see most often: single-storey garden suite replacing a move to a retirement home; parent downsizing into the backyard while the family takes the main house; step-free adu built for a homeowner anticipating mobility loss; caregiver housed on-site in a secondary suite.
Related service: Garden Suites
Our estimate band on a 700 sq ft reference unit runs $16,000-$32,500 in King to $17,000-$34,000 in East York, about $385-$402 per square foot. This scope involves drawings, calculations and the permit submission rather than construction. Municipal approvals are quoted on top and separately, between $5,500-$10,000 including Brampton registration and Peel charges and $9,000-$16,000 including Peel Region and septic permit charges depending on the municipality.
Related service: Our ADU services
On most serviced GTA lots, yes. Bill 23 and O. Reg. 299/19 permit up to three residential units as-of-right on a lot already holding a detached, semi-detached or townhouse dwelling.
What actually decides it is the local by-law's rear-yard coverage, setback and height limits, plus conservation-authority screening (TRCA, Credit Valley, LSRCA) where the lot is in a regulated area. We check all of that before design starts, not after.
Related service: Our ADU services
It depends on the lot rather than on the preference. A rear yard with clear access supports a detached garden suite or laneway house; an existing garage on a sound slab makes a conversion the cheapest legal route; a full-height basement with a walk-out is the fastest path to a permitted interior suite. We give the answer at the feasibility review, with the by-law citation behind it.
Related service: Laneway Homes
Eight to fourteen months end to end - design, four to eight weeks of plan review, then construction - across all 30 GTA municipalities we serve. Excavation is scheduled inside the local building season; interior work continues through winter.
Related service: Our ADU services
Building for aging in place? As adu builders across the GTA we scope the ADU that fits your lot - zoning check, permit drawings and construction.